East Legon
Commercial
Synlab Office Renovation
A commercial renovation, delivered end to end
Barmas delivered the renovation of SynLab’s diagnostics facility in East Legon as a full, managed project: from assessing the existing structure, through structural finishing, to a completed glass facade and entrance signage. One team carried the work from planning through to handover, the same process Barmas applies to its residential builds, here applied to a commercial fit-out instead of a home.
The project sits alongside Barmas’ other developments as an example of its commercial capability: proof that the same end-to-end approach behind its private homes holds up just as well on a client-facing commercial building.
Offering 1.2 million square feet of office space, over 12,000 square feet of retail space and 339 parking stalls, 160 Front Street West is slated for completion in late 2023.
Engaging customized SMART building and construction technologies developed by PCL, we are implementing our award-winning Job Site Insights™ (JSI) and Eddy Solutions™ sensor technologies on this project including, for example, concrete curing sensors that accelerate pour cycle times and reduce project costs. Together with Cadillac Fairview, PCL is constructing to LEED® Platinum and WELL Building Standards and – once operational – 160 Front will embrace Cadillac Fairview’s award-winning “Green at Work” program that harnesses leading global practices to integrate sustainability into property management and operations.